Showing posts with label Lean. Show all posts
Showing posts with label Lean. Show all posts

Monday, November 3, 2014

GET RID OF WASTE

HAVE YOU EVER THOUGHT…?

How much waste does your organization produce? Do you have a large inventory stocked? Do you have bigger spaces rented than you need? Do you order materials much in advance to avoid running out?
These are all WASTES that your organization is producing. These cost you and your customers money; money that can be put to better use. If you price your products more, you will lose your customers to your competitors. That is the last thing we want when running an organization. To stay in the competition you are required to be flexible – to be able to meet the changing requirements of your customers.[1]

There are several posts on lean implementation in various industries. My blog focuses on what these wastes are and how to get rid of them.

GET RID OF WASTE!





Many people think that lean is suited only for manufacturing. That’s not correct! Lean applies in every business and every process: Healthcare, manufacturing, service based firms, government. The difference is that they change the name of the system from ‘Lean’ to something more personal, example the ‘Toyota Production System’. To them, lean is not a cost reduction program, but the way the company operates. It requires a complete transformation from old-ways to ‘lean-thinking’. This takes a long-term perspective, perseverance and skill-set.
Lean involves change from conventional "batch and queue" mass production to product-aligned "one-piece flow" pull production. The "one-piece flow" system rearranges similar processes to be next-to each other and in parallel if possible. [4]

The Toyota Production System is a paradox. On the one hand, every activity, connection, and production flow is very rigidly to meet highest customer satisfaction. Yet at the same time, these systems are very flexible and responsive to customer demand.
After an extensive four-year study, the authors understood how to resolve this paradox. The rigidity of the systems makes the flexibility possible. Confused???
The company's operations are a continuous series of controlled experiments. With every new designs specification, Toyota establishes a hypothesis that is then tested through action. This approach is not imposed rather ingrained into the workers’ mindset. The authors lay out four principles that teach their workers new methodologies:
·         The first rule governs the way workers do their work.
·         The second, the way they interact with one another.
·         The third governs how production lines are constructed.
·         And the last, how people learn to improve.

Every activity must have built-in tests that signal problems as soon as they occur. The continual responses to problems makes this seemingly rigid system so flexible and adaptive to changing circumstances. [5]


CHALLENGE IS TO REMOVE WASTE AND ADD VALUE


JUST FIVE STEPS [2]

The five-step thought process for implementing lean techniques:
 1. Identify value for customers by product type.
2. Identify steps that don’t create value and eliminate them.
3. Create a smooth flow of the products to the customers by making the value-creating steps occur in tight sequence.
4. Establish the flow and let customers pull value from the next upstream activity.
5. Iterate the process until perfection is reached.

WASTES [3]

T – Transportation: It adds a lot of extra time without increasing value, and can lead to damages. This occurs due to poor plant layouts where the products have to travel a lot of distance and in loops. Related manufacturing units should be kept together.

I – Inventory: Extra inventory reduces cash and storage space. Stocks may also deteriorate and get damaged and have to be removed. Think about clothes that went out of fashion, food that got stale.

M- Motion: Work spaces that are not ergonomic lead to a waste of motion, such as stretching, twisting, bending etc. Motion takes time, adds no value, and can lead to injuries.
W – Waiting: Waiting for others to finish their work hinders smooth flow of products. The failure point of a process is its weakest link. Processes should be aligned in a way that no-one needs to wait for others to finish their work.

O - Over Production: Excessive production is harmful. Excessive inventory is harmful. Over Production is the worst type of waste.

O - Over Processing: Over-processing is doing extra and duplicating work i.e. completing two or three inspections, measuring components more than once.

D – Defects: Defective parts, products, or services reduce cash and lead to customer dissatisfaction. Examples are: making items to the wrong specification.

S – Skills: Workers should be well-trained for the job they are given. We all perform to our best when we are right for the job and the job is right for us. Examples include: Managers who ignore the employee’s opinion.